design build projects
Monday, March 31, 2014
Bathroom remodel
Bathroom Remodel.
New wainscoting, mirror, light, sink, hardware, painting.
Thursday, September 26, 2013
Mudroom
Mudroom "before" and "after".
Mudroom: finished
High Gloss Oil Painted door.
Mudroom
Mudroom remodel. New ceiling, tile floor, custom pantry, new wood trim work.
Thursday, June 27, 2013
Bathroom Remodel. Design and installation.
Bathroom remodel. Design and Installation.
Bathroom remodel. Design and Installation.
Bathroom remodel. Design and installation. Tile, marble, granite.
Small shaped subway tile Kitchen BackSplash.
Courtyard. Pennsylvania black slate with river stone details.
New tile floor with pencil marble border, marble threshold.
Wednesday, June 26, 2013
Shower Stall repair. Termite damage caused a wall failure, so shower stall was torn out.
New shower base installed, new cement board installed, new tiles replaced, glass door/ wall installed.
Tuesday, June 25, 2013
test.
Home
Subscribe to:
Posts (Atom)